2.95M

Kupal Additional Maintenance Contractor

1.

National Iranian Oil
Company
Additional Maintenance Support
for Kupal Facilities
Kupal Oil Field (Asmari Reservoirs)
NIOC / NISOC
Maintenance Department | October 2026

2.

O&M CONTRACT KEY ACHIEVEMENTS
2
Emergency repairs
Execution of emergency repairs across the field.
Gas Injection Station
Restoration and restart of both trains, including hydrostatic testing of the injection lines.
KL-63 flowline
Restoration of the flowline serving well KL-63.

3.

CONTINUED COOPERATION AND SUPPORT REQUIREMENTS
3
Support for continued cooperation
If cooperation with MOGPC continues, an additional contractor will be required to support
safe and reliable operation of the facilities.
Completion of necessary maintenance
Additional resources are needed to complete work that MOGPC cannot fully perform with
its available resources.
Coverage of services outside the existing contract
Include equipment overhaul above 4,000 hp and the separately identified support
services during hostilities.

4.

RESOURCE AND SUBCONTRACTING CONSTRAINTS
4
Current execution arrangements
MOGPC performs work with its own personnel and engages subcontractors for selected
tasks.
Limited internal resources
Available personnel and resources do not allow all necessary work to be completed.
Time required to engage subcontractors
Internal procedures applicable within a state-owned company can delay work execution
and extend equipment downtime.

5.

PREVENTIVE MAINTENANCE AND EMERGENCY SPARES
5
Preventive maintenance
Incomplete PM reduces equipment reliability and operational safety.
Support is required to complete the approved PM programme in full.
Emergency spare parts stock
A lack of emergency spares extends equipment downtime while replacement parts are
procured.
Required support
Procure, maintain and replenish an agreed emergency stock of spare parts and
consumables.

6.

HOUSEKEEPING AT KUPAL PRODUCTION UNIT
6
Oil contamination
Visible deposits on
equipment and in
surrounding work areas.
Required work
Remove oil deposits,
vegetation and waste to
maintain safe working areas
and reduce slip and fire
hazards.
Strainer
Crude oil pump

7.

CORROSION PROTECTION AT KUPAL PRODUCTION UNIT
7
Knock-out drum
Visible coating deterioration and external corrosion
on the vessel and associated components.
Required work
Assess surface condition, prepare affected areas
and restore protective coatings on equipment and
pipelines.
Delayed coating restoration allows corrosion-related
defects to develop and progress.

8.

ACCESS ROAD REHABILITATION
8
KL-46 Access Road
Deep erosion and local road collapse can restrict
safe access for maintenance and emergency
vehicles.
KL-28 Access Road

9.

PROPOSED ADDITIONAL CONTRACTOR SCOPE
9
Support where MOGPC resources are insufficient
Preventive maintenance, access road repairs and housekeeping.
Repair and restoration of protective coatings on pipelines and equipment.
Emergency spare parts
Procurement, stock maintenance and replenishment of emergency spares.
Equipment overhaul above 4,000 hp
This scope is outside the existing MOGPC O&M Contract.
Provide specialist overhaul capability under the additional contract.

10.

EXPECTED RESULTS AND REQUESTED ENDORSEMENT
10
Expected results
Full completion of the approved PM programme.
Clean and safe work areas, with improved access to facilities.
Shorter equipment downtime and available emergency spares.
Requested endorsement from NIOC / NISOC
Endorse the engagement of an additional contractor to support safe and reliable facility
operation in the event of continued cooperation with MOGPC.
Agree the scope and coordination principles as the basis for the subsequent procurement
process.

11.

ADDITIONAL SUPPORT DURING HOSTILITIES
11
Separate services outside the existing O&M Contract
The additional contractor would provide essential logistical support and supplies to
facilities during hostilities.
Fuel and water delivery
Personnel catering
Transport services
Supply of consumables
Temporary power supply
Purpose: support personnel needs and essential facility functions during disruptions.
English     Русский Правила