Похожие презентации:
Construction and Operation of a Property Unit: a Case Study of the City Emergency
1.
Irkutsk National Research Technical UniversityDepartment of Valuation and Property Management
Construction and Operation of a Property
Unit: a Case Study of the City Emergency
Hospital in Novocherkassk
Student: Khramtsov D.D.
Scientific Advisor:
Assoc. Prof. Zhuravlev E.G.
Irkutsk, 2024
2.
Purposeto consider the structural solutions for
buildings, the location of the
construction site, and to provide
necessary operational measures
3.
Contents1. The object of operation and management
2. Construction site analysis
3. Structural solutions of the buildings
4. Building Operation
4.
The object of operation and management• 16,800 square meters
• 900 beds
1 - Pathology Department
2 - Department of the Medical Court Expertise
3 - Infectious Diseases Department
4 - Non-infectious department
5 - Administrative and household complex and
covered parking
6 - Maternity ward
7 - Boiler room
8 - Oxygen station
5.
Construction sitecadastral number 61:55:0000000:4577
6.
Structural solutions of the buildinglayout of monolithic reinforced
concrete elements
7.
Building OperationHigh-quality maintenance is necessary for proper operation:
yard cleaning in both winter and summer
garbage collection
major repairs
local repairs
water supply
electricity and gas supply
heat supply
sewage system
ventilation
air conditioning
8.
ResultsTo sum up, structure solutions:
meet all modern construction standards
adopt a rigid irregular cross-wall structural system.
9.
ConclusionThe city emergency hospital:
plays a crucial role in the healthcare sector
develops and improves the city's infrastructure
10.
ReferencesThere is a list of references I have used in my project: устно
References
SP 70.13330.2012 "Load-bearing and enclosing structures"
SP 118.13330.2012 "Public buildings and structures"
Explanatory note on "City Emergency Hospital in Novocherkassk "