BS organization chart 1.6.2017 https://oneplatform.sharepoint.com/sites/rumain/SitePages/Home.aspx
Mission in BS
Change management
Building System strategical targets
915.23K
Категория: МенеджментМенеджмент

BS organization chart

1.

SMM 7.6

2. BS organization chart 1.6.2017 https://oneplatform.sharepoint.com/sites/rumain/SitePages/Home.aspx

Steering group
Jyrki Tuominen
Marko Santala
Alexander Boytsov
Rodion Levin
Arsen Parazyan
BS (Platform) manager
MSan
Project development
Design steering
Strategic purchasing
Own design
Apar
Aboy
• EZol
• TBar
PG
Marko Santala
Julia Lukashevich
Ksenia Golperina
Irina Konovalova
Production
Vgor
• PRus
• NElm
08/06/2017
2

3. Mission in BS

In order
going on, update needed
Not done, started
Mission in BS
1) Development
o
o
Standardizations of technical tasks and checklists for designers (concentration B- segment)
o
VDC (Bim model+ digital processes and programs, which is using information from Bim model:
Visualization (diff. prog), Sigma (cost estimation), Titan (cost cont.), Ivalua (purc), co+location
2) Procurement
o
Making annual frame agreements materials+ works (concrete, elements, steel bars, HEPAC equipment etc
o
Group agreements (Otis)
o
Producer/supplier assessment (Q3/17)
3) Production
o
Standardization of production (white finishing 1.2, windows, balcony installation etc
o
Standardization of technical task for contractors (lack of recources)
o
o
New working methods: sprayed water insulation...
o
Increasing mount of using our own labour: enlarge to white finishing works
Creating the Master file (technical price), where to mark all actions , which affect (+/-) to the cost level
08/06/2017
3

4. Change management

Culture:
o
Discipline
o
Understanding
o
Committed
Problems, lack of information:
o
Customer inside (who is our target, segmentation etc...)
o
Recources
Actions:
o
Using internal newletters (news and success stories)
o
Internal trainings yearly base
o
Strong focus only B-segment
08/06/2017
4

5. Building System strategical targets

Background/Opportunity/project description: ”what is the problem we want to solve”
Multiple product variations (A, B+& B- and C segments)
Multiple design solutions
Big difference in construction costs
Target end state/objective/benefits/questions to be answered: ”what do we want to achieve”
To decrease technical price of the product
Focusing only to B-segment – updating building system
Only one design solution for each structure for repetition
Continue working on strategical procurement and finding new providers
Project scope: ”what is included in the project”
Suppliers assessments, annual agreements, study of design solutions, project studio
Benefits of Group procurement
Full benefits of VDC (virtual design and construction)
Evaluating new production methods and materials
White finishing standard Q2/2017
Resources needed: ”people and financial”
Quality engineer, more of own blue collars on production
Using more effectively own design department
Key stakeholders incl. owner: ”Who need to be involved/informed”
Jyrki Tuominen, Marko Santala, Arsen Parazyan, Vitali Gorbatchev
Boytsov Alexander
Building System group
Active interdepartamental communication with Sales and Client Service
Limitations: ” What problems is not solved/what is not included”
Time line: ”when to start and finish”
At this moment top quality in the market = influencing costs
Clear definition and approval of all parties for B-segment quality level, level of the product we
deliver
Results enabled timely in design (design schedule and delivery), expertize, local norms
Cleaning up old design solutions (C and A segment) – Q3/2017
Identifying technical price for Magnifika 1st phase, costs from 1st floor, including main groups 3-7,
without liabilities, kindergarten and parking – end of May 2017
Master BS file including actions and sums of potential savings – end of May 2017
Quarterly result comparison
6/8/2017
5

6.

Technical structural description B-/B+
08/06/2017
6

7.

Structural identification B-
Roof:
Cast in situ slab
Heat insulation
Expanded clay
Screed
2-layer water
insulation
Thickness of slab:
200-220mm, cast in situ
Balcons:
The maximun width 2m
Facade from 2. floor:
Painted or tile brick sandwich panels
Height of floor:
3m
1. floor:
Cast in situ wall+heat insulation+ brick or sandwich panel
Basement:
Cast in situ or elements
Foundation:
Slab 400-600mm with piles
Product Group RU
08/06/2017
7