[Belt Project Name] [Level of] belt: [Name of Project leader] Master Black Belt: ABI internal coach: Date: [date] [Month] [Year]
[Project name] Executive Summary
[Project Name] Charter [project lead]
[Project Name] Team [project lead
[Project Name] Plan [project lead]
[Project Name] Communication Plan [project lead]
[Project Name] SIPOC [project lead]
[Project Name] High-level Pareto Chart [project lead]
[Project Name] Data Collection Plan [project lead]
[Project Name] FMEA [project lead]
[Project Name] Fishbone [project lead]
[Project Name] Process Analysis [project lead]
[Project Name] Action Plan [project lead]
[Project Name] Process Changes [project lead]
Define Tollgate [project lead]
[Project Name] Project Status Update [project lead]
[Project Name] Measure Summary [project lead]
[Project Name] Measure Tollgate [project lead]
[Project Name] Analyze Tollgate [project lead]
[Project Name] Improve Tollgate [project lead]
[Project Name] Process Control [project lead]
[Project Name] Control Plan Tollgate [project lead]
[Project Name] Control Tollgate [project lead]
[Project name] Conclusion
[Project Name] Sign off [project lead
1.24M
Категория: Английский языкАнглийский язык

Project templates

1. [Belt Project Name] [Level of] belt: [Name of Project leader] Master Black Belt: ABI internal coach: Date: [date] [Month] [Year]

Note: name this file: [Year]_[Month]_[Date]_Last name of project leader V [version #]
©Anheuser-Busch InBev

2. [Project name] Executive Summary

[project headline, 5 words to summarize the project goal]
3 to 4 bullets that summarize the business case, underline key points
Example 1: Maintenance for part x requires y hrs of downtime costing the company Z
in lost production
Timeline
Date
Milestone
Benefits
XXXX
XXX
XXX
XXXXXX
XXXXXX
[Yr 1]
[Yr 2]
[Yr 3]
xx
xx
xx
Cost savings:
Project Costs:
XXXX
xx
xx
xx
Cost avoidance:
XXXX
xx
Qualitative Benefits:
2
©Anheuser-Busch InBev
xx
xx

3. [Project Name] Charter [project lead]

Business Case
Measurements
Defect Definition: xxxxxxxxxxxxxxxxxxxxxxxx
Problem Statement:
Before:
After:
Xx
Xx
XXXXX
Project Scope:
In Scope:
Out of Scope:
Timeline
Date
XXX
XXX
Project Opportunity
Before:
After:
Current Scope:
Cost of Process
Xx
Xx
Translation Opportunity:
Cost of Process
Xx
Xx
Milestone
XXXXXX
XXXXXX
If this project was implemented across the company in like areas (ex.
Similar machines, similar processes for sales) What would the
benefit be
3
©Anheuser-Busch InBev

4. [Project Name] Team [project lead

Steering Committee]
Name
Name
Name
Name
Project Champion
[Position]
[Position]
[Position]
Name
Project Leader
Function name
Function name
Function name
Function name
Function name
Function name
Name
Name
Name
Name
Name
Name
position
position
position
position
position
position
Name
Name
Name
Name
Name
Name
position
position
position
position
position
position
Name
Name
Name
Name
Name
Name
position
position
position
position
position
position
Core Team
4
©Anheuser-Busch InBev
__________
Name
Master Black belt
__________
Name
Finance
Representative
As Needed Support/
Functional Experts

5. [Project Name] Plan [project lead]

# Topic
A
1
2
3
4
5
"Plan A" - Analyse Profit Impact SPG Production Canada 2009 - 2011
Calculation Profit Gap - Identification of Objective
To distribute briefing/communication plan to all team members
Internal Alignment on information base, objective, project approach and first action points
Identificaton of (alternative) brewing Location
Identification of fix costs production Canada (kegs, Mold …)
6
7
8
9
10
Status 18 19 20 21 22 23
done
Calculation of TFP per pick up location (direct vs both warehouses) and comparison analysis to base
Analysis of profit impact US-$ vs Can-$ vs Eur
Calculation of FOB cost 2008
Analysis of transport costs Crown side a) 2008 (base) b) 2009 (Canada per pick up location)
Calculation of transport cost savings
MS, TH
TH
CH, TH
CH, TH
CH, AO
AO, CH, TH,
PvW
MF
MF
SW,AA, CH
SW, TH
B
1
2
3
4
5
6
"Plan B" - Analyse Profit Impact Profit Generation Project 2009 - 2011
Calculation Profit Gap - Identification of Objective
Alignment on "Plan B" requirement and expectation
To analyse price increase (modest and aggressive scenario)
To analyse volume impact and development
To analyse possible marketing cost savings
To calculate profit implication for both
MS, TH
MS, TH
MS, BJ
MS, BJ
PV, TW, TH
MS, TH
done
C
1
2
3
4
Consumer Research
To prepare agency briefing
To review and approve and agency briefing
To run market research
To analyse and present result market research
PV, TW
InBev Marketing
ABM
ABM
done
D
1
2
3
4
Alignment Crown/InBev
Alignment on implication market research
Alignment on profit calculation result and allocation (Plan A and Plan B)
Alignment on next steps
Alignment on AOP 2009
E EBM Presentation and Project approval
5
Responsible
26
27
28
29
30
done
done
done
done
2 3 .7
done
done
done
done
done
done
done
done
done
done
done
done
done
done
done
F Packing Development (yet not specified)
Crpwn, InBev pending
G Technical and Quality Aspects
CH, AO, PvW pending
©Anheuser-Busch InBev
25
done
done
Insert Specific Project Time
line
done
EBM, TH
24
2 1.7
31
32
33
34

6. [Project Name] Communication Plan [project lead]

Communication to:
Method
(Meeting, Phone call)
6
©Anheuser-Busch InBev
Frequency
Team Member who is
Responsible for the
action

7. [Project Name] SIPOC [project lead]

Supplier
Input
Template extracted from Moresteam.com. All Rights Reserved.
7
©Anheuser-Busch InBev
Process
Output
Customer

8. [Project Name] High-level Pareto Chart [project lead]

8
©Anheuser-Busch InBev

9. [Project Name] Data Collection Plan [project lead]

Data Collection Goal:
Operational Definitions:
Data Collection Plan:
(Detail the Who, What, When, and How)
9
©Anheuser-Busch InBev

10. [Project Name] FMEA [project lead]

FMEA Title/Item: ________________________________________
Prepared By: ___________________________________________
Process Responsibility:
__________________________________
FMEA Date (Orig) _________________ (Rev)
_________________
Core Team ______________________________________________
Page __ of __
Process Function
Requirements
A) SEVERITY
Rate 1-10
10=Most
Severe
Class
Potential
Failure Mode
Potential
Effect(s)
of Failure
Potential
Cause(s) /
Mechanism (s)
of Failure
B) OCCURRENCE
Probability
Rate 1-10
10=Highest
Probability
Current
Process
Controls
Prevention
RISK Recommended
Current C) DETECTION PRIORITY
Action(s) Responsibility
Action Results
Probability
NUMBER
Process
(Complete and Target
Rate 1-10
RPN
Controls
after
Completion
Detection 10=Lowest
Imprvements
Date
Actions
have been
Taken Sev Occ Det RPN
Probability
AxBxC
validated)
0
0
0
0
0
0
0
0
0
0
0
0
0
Template extracted from Moresteam.com. All Rights Reserved.
10
©Anheuser-Busch InBev
0
0
0
0
0
0
0
0
0
0
0

11. [Project Name] Fishbone [project lead]

Insert Minitab Cause-and-Effect Diagram
Cause-and-Effect Diagram
Measurements Materials
Human
Measurable
Undesirable
Effect
Mother Nature
11
©Anheuser-Busch InBev
Methods
Machines

12. [Project Name] Process Analysis [project lead]

Insert additional process Analysis tools
12
©Anheuser-Busch InBev

13. [Project Name] Action Plan [project lead]

#
Date \
Topic
(ROOT
CAUSE)
1
2
3
13
©Anheuser-Busch InBev
Action
(WHAT)
Comments
(HOW)
Accounta
bility
(WHO)
Begin
Date
(WHEN)
End Date
(WHEN)

14. [Project Name] Process Changes [project lead]

As is Process [name]
x
X
x
x
X
x
x
X
x
x
“To Be” Process [name]
x
New Step
x
If applicable detail any process changes
14
©Anheuser-Busch InBev
x
x

15. Define Tollgate [project lead]

Key Findings From Define Phase:
• 4 – 5 bullets summarizing findings
Measure Proposal
• 4- 5 bullets documenting plans for Measure phase
Timeline for Measure Phase:
Benefits
Revisit, mark adjustments
Date
Milestone
[Yr 1]
[Yr 2]
[Yr 3]
xx
xx
xx
Cost savings:
XXXX
XXX
XXX
XXXXXX
XXXXXX
Project Costs:
XXXX
xx
xx
xx
Cost avoidance:
XXXX
xx
Qualitative Benefits:
1 page to summary of define phase, to be used in the project tollgate to move to Measure Phase.
Include
for testing plans,
15 plans
©Anheuser-Busch
InBev include key learnings and plans for the next phase of the project
xx
xx

16. [Project Name] Project Status Update [project lead]

Key Actions: Last 7 days
Planned Actions: Next 7 Days
Project Risks:
This area is only for high impact risks where you need additional support
Risk
Impact
Action Plan
Responsibility
1
2
3
Low Risk
Low Impact
16
©Anheuser-Busch InBev
High Risk
High Impact

17. [Project Name] Measure Summary [project lead]

Create a summary of the actions taken
17
©Anheuser-Busch InBev

18. [Project Name] Measure Tollgate [project lead]

Key Learnings from Measure:
Proposal for Analyize Phase:
(insert Minitab )
Proposed Process Changes:
Timeline for Analyze Phase:
Detail any process changes, or impact to the current process
1 page to summary of Measure phase, to be used in the project tollgate to move to Analyze Phase.
Include
for implementation
of standard operating procedures, incorporation into existing excellence programs, updated
18 Plans
©Anheuser-Busch
InBev
training documents, etc

19. [Project Name] Analyze Tollgate [project lead]

Key Learnings from Analyze:
Proposal for Improve Phase:
(insert Minitab )
Proposed Process Changes:
Timeline for Improve Phase:
Detail any process changes, or impact to the current process
1 page to summary of Analyze phase, to be used in the project tollgate to move to Improve Phase.
Include
for implementation
of standard operating procedures, incorporation into existing excellence programs, updated
19 Plans
©Anheuser-Busch
InBev
training documents, etc

20. [Project Name] Improve Tollgate [project lead]

Key Learnings from Improve:
Proposal for Control Phase:
(insert Minitab )
Proposed Process Changes:
Timeline for Control Phase:
Detail any process changes, or impact to the current process
1 page to summary of Improve phase, to be used in the project tollgate to move to Control Phase.
Include
for implementation
of standard operating procedures, incorporation into existing excellence programs, updated
20 Plans
©Anheuser-Busch
InBev
training documents, etc

21. [Project Name] Process Control [project lead]

Show proof of process control through control charts
21
©Anheuser-Busch InBev

22. [Project Name] Control Plan Tollgate [project lead]

Revision Number
1.0
Date
Facility
Location
Critical to
Sig.
Significant
Quality
Char. Characteristic Chart
Chart
Chart Measurement Measurement Reaction
Characteristic #
Description Type Champion Location
Method
Study
Plan
A
A-1
A-2
B
B-1
B-2
Gage
Sampling Process Process
Number/ID
Plan
Stability Capability
Transition Plan
Detail how this can be transitioned to other areas
Template extracted from M oresteam.com. All Rights Reserved.
22
©Anheuser-Busch InBev
Benefits/Risks of Transition
Benefits
Risks

23. [Project Name] Control Tollgate [project lead]

Evidence of Control:
Control Plan Actions:
• Update to Standard Operating Procedure
• Training document update
• Incorporate into VOP, WCCP program
Evidence of control
(insert Minitab control chart)
Key Process Changes:
Timeline for Implementation:
Detail any process changes, or impact to the current process
1 page to summary of Check phase, to be used in the project tollgate to move to “act” Phase.
Include
for implementation
of standard operating procedures, incorporation into existing excellence programs, updated
23 Plans
©Anheuser-Busch
InBev
training documents, etc

24. [Project name] Conclusion

[project headline, 5 words to summarize the project goal]
3 to 4 bullets that summarize action taken & Problem Solved
Timeline
Date
Milestone
Benefits
XXXX
XXX
XXX
XXXXXX
XXXXXX
[Yr 1]
[Yr 2]
[Yr 3]
xx
xx
xx
Cost savings:
Project Costs:
XXXX
xx
xx
xx
Cost avoidance:
XXXX
xx
Qualitative Benefits:
24
©Anheuser-Busch InBev
xx
xx

25. [Project Name] Sign off [project lead

Steering Committee]
__________
Name
Project Champion
__________
Name
position
__________
Name
position
__________
Name
position
__________
Name
position
Function name
Function name
Function name
__________
Name
position
__________
Name
position
__________
Name
position
Function name
__________
Name
position
Function name
Function name
__________
Name
position
__________
Name
position
Name
Name
Name
Name
Name
Name
position
position
position
position
position
position
Name
Name
Name
Name
Name
Name
position
position
position
position
position
position
Core Team
25
©Anheuser-Busch InBev
__________
Name
Master Black belt
__________
Name
Finance
Representative
As Needed Support/
Functional experts
English     Русский Правила