Output sheets

GT PRO Overview Thermoflow Inc

1.

Thermoflow Inc.
This tutorial is a PowerPoint® file which includes recorded
narration. Automatic slide sequencing is coupled to the
sound track.
For the most effective use, please ensure that your computer
is equipped with a sound card and that it is activated.
If you cannot hear this message from your computer’s
speakers, please connect them.
Should there be an excessive delay between slides, press the
spacebar to proceed.

2.

Plant conditions:
120 – 150 MW
Pure combined cycle – no process steam
“Greenfield” site – Midwest USA
By river – once through cooling
Use ISO ambient conditions
Need plant output, fuel consumption, rough
construction costs, and plant layout
ASAP

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

25.

26.

27.

28.

40

29.

30.

31.

32.

33.

34.

Gas Flow

35.

36.

Area with red border is zoomed-out view of HX Locations & Duties input
panel.

37.

38.

39.

40.

41.

42.

43.

44.

1.0

45.

46.

47.

48.

49.

50.

51.

52.

53.

54.

55.

56.

57.

58.

59.

60.

61.

62.

63.

64.

65.

66.

67.

68.

69.

70.

71. Output sheets

72.

In less than 15 minutes, you have an accurate heat balance, plot plan, and
rough cost estimate using Thermoflow’s GTPRO software !
English     Русский Правила