5.47M
Категория: СтроительствоСтроительство

Construction of Reservoir, Sedimentation Tank & Irrigation System at Berry Farms in Uzbekistan

1.

Construction of
Reservoir,
Sedimentation Tank &
Irrigation System at
Berry Farms in
Uzbekistan

2.

Agenda
#
Description
1
Present the progress made during the past week (6th September to 13th of September).
2
Issues and concerns
2

3.

3
Dashboard
Project
Description:
2 sumps are being worked on in parallel and works are being carried
out in accordance with quality and standard rules
About 17 techniques are involved for water reservoirs till today
Earthwork excavations, leveling and compaction works are being
monitored daily
Reservoir: Excavation works commenced on 09.02.2023
Pre-water: Setting out completed.
Irrigation:
Project Performance:- Irrigation
System
Project Performance:Reservoir
700 000,00
2 000 000,00
649K
PV
500 000,00
400 000,00
300 000,00
1 600 000,00
Data Line 15.02.2023
600 000,00
200 000,00
1.749M
PV
1 800 000,00
1 400 000,00
1 200 000,00
1 000 000,00
800 000,00
Data Line 1.02.2023
Summary:-
600 000,00
EV
EV
400 000,00
100 000,00
200 000,00
0,00
SPI (value) = 1.24 = (EV/PV)
16/5
0,00
16/5
SPI (value) = 1.04
Legend:
Base Line –
Actual -
3

4.

4
Reservoir & Pre-Waterpool
Progress
Overview:
Roads were made for the smooth movement
of machinery
Excavation in the segmentation tank is almost
complete
Photos:-
Reservoir:Earthwork Excavati on
100%
14%
87%
Level l i ng & Compacti on
100%
17%
83%
Instal l ati on of Geo-Texti l e
100%
0%
100%
Instal l ati on of Geo-Texti l e
100%
0%
100%
Concrete Pl atform (1.5m wi de)
100%
0%
100%
Instal l ati on of Fence
100%
0%
100%
0%
UPDATED ON 30.06.22
Pre-Waterpool:Development Key
Items
Feb
Mar
Apr
May
Agreed
Actual
Planned
Var
Earthwork excavation
100%
80%
20%
Gravel Filling & Compaction
Polyethene Film
Instalaltion - (Min 1000
Guage)
Concrete Base Slab
Installation of Water Bar
(bentotine)
Walls & Concrete Platform
100%
40%
60%
100%
0%
100%
100%
0%
100%
100%
0%
100%
100%
0%
100%
4

5.

5
Irrigation System
Progress
Overview:
Basically, Now, tranches of strawberry sub
main lines are excavated
almost 2000 trenches were dug
Photos:-
Irrigation System:Cherry Farm - Main Line
100%
0%
100%
Cherry Farm - SubMain Line
100%
0%
100%
Irrigation Valves & RTU
100%
0%
100%
Drip Line and accessories
100%
0%
100%
Head Unit
100%
0%
100%
Main Line
100%
0%
100%
SubMain Line
100%
0%
100%
Irrigation Valves & RTU
100%
0%
100%
Drip Line and accessories
100%
0%
100%
Testing & Commissioning
100%
0%
100%
Blueberry , Blackberry, Raspberry & Strawberrry Farm
Handover
5

6.

Area of Concerns
ISSUES & CONCERNS
• Due to the fact that it is winter now, there are problems with moving equipment in the field, earthwork excavation of segmentation
and main tanks, compaction them, and digging trenches. Techniques are sinking in the mud.
• A separate working group has been assigned the task of completing the amenities specified on Appendix A.
• Due to the fact that there are residential areas around the facility, the technics cannot work until late at night
6

7.

Project Schedule (Reservoir)
Legend:
Base Line –
Actual -
7

8.

Project Schedule (Irrigation)
Legend:
Base Line –
Actual -
8

9.

Project Schedule (Irrigation)

10.

Technical Submission Status
Material
Description
BOQ Ref.
Manufacturer
Supplier
Technical Submission Status
Material
Transmittal
Submission Approval
Submittal
Ref.
Status
Status
Ref.
1
HDPE Pipe & Fittings
Bill.N0.03 - Irrigation / Main Line &
Sub-Main line (Sub-Clause 3.3)
Cosmoplast
Cosmoplast
AG/AF/2022-001 AG-AF-MS-01-00
04.01.22
Approved
60%
50%
2
uPVC pipes & Fittings
Bill.N0.03 - Irrigation / Main Line &
Sub-Main line (Sub-Clause 3.3)
Cosmoplast
Cosmoplast
AG/AF/2022-001 AG-AF-MS-01-00
04.01.22
Approved
30%
30%
3
Irrigation Network
Drawing
Bill.N0.03 - Irrigation / Irrigation Network
Installation works (Sub-Clause 3.6)
Netafim
Netafim
AG/AF/2022-001 AG-AF-D-01-00
04.01.22
Approved
50%
50%
4
Drip tube & Fittings
Bill.N0.03 - Irrigation / Irrigation System
for Open Field (Sub-Clause 3.4)
Netafim
Netafim
AG-AF-2022-002 AG-AF-MS-02-00
04.01.22
Approved
40%
30%
5
Solenoid Valve &
Communication cable
Bill.N0.03 - Irrigation / Irrigation Network
Installation works (Sub-Clause 3.6)
Netafim
Netafim
AG-AF-2022-003 AG-AF-MS-03-00
04.01.22
Approved
39%
30%
6
Valves & Fittings
Bill.N0.03 - Irrigation / Irrigation Network
Installation works (Sub-Clause 3.6)
Netafim
Netafim
AG-AF-2022-004 AG-AF-MS-04-00
04.01.22
Approved
39%
30%
7
Irrigation pump &
Fertigation Assembly
Bill.N0.03 - Irrigation / Irrigation Network
Installation works (Sub-Clause 3.6)
Netafim
Netafim
AG-AF-2022-005 AG-AF-MS-05-00
04.01.22
Approved
40%
0%
8
Isolation Valve
Bill.N0.03 - Irrigation / Irrigation Network
Installation works (Sub-Clause 3.6)
Conex Universal
Limited
Tri Star Sanitary
AG-AF-2022-006 AG-AF-MS-05-00
Materials
31.01.22
Approved
39%
0%
Civil
Geo Technical Report
Bill.N0.01 - Preliminaries (Sub Clause
1.3)
-
-
AG/AF/2022-005 AG-AF-MS-05-00
14.01.22
Approved
100%
100%
Electrical
Electrical Networks for
Farms & Service
Buildings Drawing
-
Al Najma
Thahabiya
Electrical &
Mechanical
Contracting
AG-AF-2022-007 AG-AF-D-02-00
14.01.22
Approved
0%
0%
#
Discipline
Installation Status
Material
Installation
Delivery
Status
Status
Irrigation
9
10
Bill.N0.04 - Electrical / Greenhouse
Materials (Sub-Clause 4.1. to 4.3)
10

11.

Technical Submission Status
Technical Submission Status
#
Discipline
Material
Description
41
Civil
Diesel Tank
BOQ Ref.
Manufacturer
Supplier
Transmittal
Ref.
Bill.N0.02 - Civil & Structure / Greenhouse
Materials (Sub-Clause 12.0)
Agritek
Agritek
AG-AF-2022-52
Material
Submission
Submittal Ref.
Status
AG-AF-MS-36-01
02.09.22
Approval
Status
Approved
Installation Status
Material
Installation
Delivery
Status
Status
-
-
11

12.

Progress Photos
1212

13.

Progress Photos
1313

14.

Debuyt
P.O. Box 2297, Abu Dhabi,
United Arab Emirates
[email protected]
+971 2 554 1000
agritek.ae
Thank You
English     Русский Правила