1. Three Gorges Dam
Сацкий Алексей
1
Location: China (Yangtze River).
Height: 181 m.
Width: 115 m.
Length: 2309 m.
Build time: 1992 – 2012.
Capacity: 22,500 MW.
Cost: $28 billion.
2
Material used:
- cement (10.82 million tons)
- steel (2 million tons)
- timber (1.6 million cubic meters)
3
4