Похожие презентации:
CC-Link IE Field Basic
1.
CC-Link IE Field BasicCCLink IE Field One Network workshop
COPYRIGHT © 2010 MITSUBISHI ELECTRIC EUROPE B.V. ALL RIGHTS RESERVED.
2. CC-Link IE Field Basic - overview
CC-Link IE Field Network Basic is an factory automation network using the standard Ethernet.Data is periodically
communicated between the
master station and slave
stations using link devices
(cyclic transmission).
CCLink IE Field One Network workshop
COPYRIGHT © 2010 MITSUBISHI ELECTRIC EUROPE B.V. ALL RIGHTS RESERVED.
3. CC-Link IE Field Basic – features
Cost saving of the systemAccessible devices
CCLink IE Field One Network workshop
Using different protocols
Easy system configuration
COPYRIGHT © 2010 MITSUBISHI ELECTRIC EUROPE B.V. ALL RIGHTS RESERVED.
4. Number of link points
The number of link points per slave station is 64 points for RX/RY and 32 points for RWr/RWw.However, by changing the number of occupied stations, RX/RY can be set to a maximum of 256
points in increments of 64 points and RWr/RWw can be set to a maximum of 128 points in
increments of 32 points.
CCLink IE Field One Network workshop
COPYRIGHT © 2010 MITSUBISHI ELECTRIC EUROPE B.V. ALL RIGHTS RESERVED.
5. Operation of the link scan
After sending the requests to all of slave stations and subsequently receiving responses fromall the slave stations, the master station starts the next link scan. Link refresh is performed in
END processing after receiving responses from all the slave stations.
St: Scan time
Ls: Link scan
END: END processing
1. The master station
sends a request to
slave station 1 and
slave station 2.
2. Slave station 1 sends
a response to the
master station.
3. Slave station 2 sends
a response to the
master station.
4. Once the master
station has received
responses from slave
station 1 and slave
station 2, the master
station starts the next
link scan.
CCLink IE Field One Network workshop
COPYRIGHT © 2010 MITSUBISHI ELECTRIC EUROPE B.V. ALL RIGHTS RESERVED.
6. Operation of the link scan iQ-F
After sending requests to all slave stations, the master station receives responses from slavestations in END processing. After receiving responses from all the slave stations, the master
station performs link refresh and starts the next link scan.
St: Scan time
Ls: Link scan
END: END processing
1. The master station
sends a request to
slave station 1 and
slave station 2.
2. Slave station 1 sends
a response to the
master station.
3. Slave station 2 sends
a response to the
master station.
4. Although the master
station received
responses from slave
station 1 and slave
station 2, the master
station does not start
the next link scan until
link refresh is
performed in END
processing.
CCLink IE Field One Network workshop
COPYRIGHT © 2010 MITSUBISHI ELECTRIC EUROPE B.V. ALL RIGHTS RESERVED.
7. Performance specification
CCLink IE Field One Network workshopCOPYRIGHT © 2010 MITSUBISHI ELECTRIC EUROPE B.V. ALL RIGHTS RESERVED.
8. FR-A800-E Ethernet function selection
FR-A800-E CC-Link IE Field Basic specification:CCLink IE Field One Network workshop
COPYRIGHT © 2010 MITSUBISHI ELECTRIC EUROPE B.V. ALL RIGHTS RESERVED.
9. FR-A800-E IP address setting
CCLink IE Field One Network workshopCOPYRIGHT © 2010 MITSUBISHI ELECTRIC EUROPE B.V. ALL RIGHTS RESERVED.
10. FR-A800-E IP filtering function
CCLink IE Field One Network workshopCOPYRIGHT © 2010 MITSUBISHI ELECTRIC EUROPE B.V. ALL RIGHTS RESERVED.
11. IP address for command source selection
CCLink IE Field One Network workshopCOPYRIGHT © 2010 MITSUBISHI ELECTRIC EUROPE B.V. ALL RIGHTS RESERVED.
12. IP address for command source selection
CCLink IE Field One Network workshopCOPYRIGHT © 2010 MITSUBISHI ELECTRIC EUROPE B.V. ALL RIGHTS RESERVED.
13. FR-A800-E CC-Link IE Field Basic
FR-A800-E CC-Link IE Field Basic specification:CC-Link extended setting
CCLink IE Field One Network workshop
COPYRIGHT © 2010 MITSUBISHI ELECTRIC EUROPE B.V. ALL RIGHTS RESERVED.
14. FR-A800-E CC-Link IE Field Basic
CCLink IE Field One Network workshopCOPYRIGHT © 2010 MITSUBISHI ELECTRIC EUROPE B.V. ALL RIGHTS RESERVED.
15. FR-A800-E CC-Link IE Field Basic
CCLink IE Field One Network workshopCOPYRIGHT © 2010 MITSUBISHI ELECTRIC EUROPE B.V. ALL RIGHTS RESERVED.
16. GOT2000 & CC-Link IE Field Basic
GOT2000 & CC-Link IE Field BasicCCLink IE Field One Network workshop
COPYRIGHT © 2010 MITSUBISHI ELECTRIC EUROPE B.V. ALL RIGHTS RESERVED.
17. GOT2000 & CC-Link IE Field Basic
GOT2000 & CC-Link IE Field BasicCCLink IE Field One Network workshop
COPYRIGHT © 2010 MITSUBISHI ELECTRIC EUROPE B.V. ALL RIGHTS RESERVED.
18. CC-Link IE Field Basic Master Setting
CCLink IE Field One Network workshopCOPYRIGHT © 2010 MITSUBISHI ELECTRIC EUROPE B.V. ALL RIGHTS RESERVED.