Workplace organization. Work planning

1.

Workplace organization. Work
planning.
Main stages.
Operations during the installation of electrical
networks

2.

Main stage.
• Electrical installation work is a relatively complex and time-consuming
procedure especially if it concerns facilities where such system are being
arranged from scratch. Such operation can be divided into several successive
stages:
• 1) Preparation
• 2) Transportation of structures
• 3) Checking functionality

3.

Preparation
• Preparation involves the arrangement and installation of special types of
fastners for specific electrical appliances. Preparation occupies one of the
most important places in the main stages, since without a prepared place,
work will not go.

4.

Transportation of structures
• Transportation of structures that are planned to be used in such system. At
this stage, they are fully installed in accordance with modern standarts and
safety rules. Transportation also has a significant place, because if there are
no materials with which it will be possible to carry out work, then the work
will simply fall into place.

5.

Checking functionality
• This stage ia very important, as it allows you to identify the shortcomings of
the system and fix them. If you do not identify shortcomings, then they can
be revealed during operation. And in order for this not to happen, the master
must be competent, disciplined and attentive. If all this is observed, then the
work will be done 100 procent.

6.

Operations duting the installation of electrical
networks.
• Several different operations can be attributed to electrical work. But also do
not forget about how careful you need to be when performing them and do
not forget to observe safety precautions. And then everything will be good)))
• The next slide will describe the types of these same works with their brief
characteristics.

7.

Location planning and cable replacement
• Both hidden and open mounting methods can be used here, which depends on the needs of
the client.
• Hidden wiring can be done in two ways. The first, classic option is the placement of cables
and network elements inside the gate or under the skin. The second option, which has been
gaining popularity lately, is the use of special pipes and cable channels. In fact, the wires are
hidden from view, but they are not located inside the wall.
• With open wiring, the following methods of laying wires and cables are used: directly on the
surface of walls, ceilings, etc., on strings, cables, rollers, insulators, in pipes, boxes, flexible
metal sleeves, on trays, in electrical baseboards and platbands, free suspension, etc.

8.

Replacement of switches, sockets
• It also involves setting them up, checking and vestoring their operability. In
some cases, these elements may also be transferred from one place to
another.

9.

And other types of operations with their
description
• Replacement installation and adjustment all types or lighting devices(chandeliers, lamps,
etc.)
• Installation of meters ,RCD protection system, etc.
• Installation and calculation of the panel. All functionall systems are also connected it.
• Installation of the grounding system as well as the arrangement of lightning rods and
other protective sructures
• Laying the network. These operations include the installation of a fiber-optic or
television cable, followed by connection to a specialized system.