Quality Improvement

1.

▣ 4M Change Report
HCr_FB
SU2r
Cooling Module Ass’Y
25304-H5050/20/60
25304-BW000/050
Part No.
Doowon
■ Quality Improvement □ Cost Reduction □ Productivity Improvement □ Transfer Production Process
□ C/O part spread application
□ Manufacturing method change □ 2nd vendor change
□ etc
□ New mold
□ Using for a long time not used mold
Document
■ Inspection Agreement ■ Inspection Standard □ Control Plan □ Process FMEA □ Design FMEA
Review of
Consumer
■ ISIR Required □ SPA needed
Date
15/11/2021
Modified
contents
Supplier
■ Fit and Funtion needed ■ Reliability test needed □ etc (
Scheduled
Date
25/11/2021
□ etc
Prepared
Approved
Condenser tube supplier
changed
4M
)
Method of identifying
modified part
Pallets with first improved parts will be identified with
4M Change Tag
Condenser tube supplier changed
After
Before
Tube supplier - LS A3102
Tube supplier - RSM A3102
Suppliers
Suppliers
Detailed
Checked
CUSTOM
ER
Reason
Part Name
SUPPLIER
Car
Model
1
LS
1
RSM
2
JDAP
2
JDAP
3
DWR
3
DWR
4
HMMR
4
HMMR
modificati
ons
UF-PJ-00000
Copyright ⓒ 2008 Hyundai / Kia
PAGE : 1 / 1