16.54M
Категория: ПромышленностьПромышленность

Luqi And Sunshine Frames Welding project

1.

Luqi And Sunshine
Frames Welding project
Aug. 2023

2.

AVTOTOR
Production Description
LUQI EV600
1 STEP: Main frame welding
2 STEP: All parts welding

3.

AVTOTOR
LUQI Tree Flow Chart
Part №1
Part №2
STEP 1
Part №3

4.

AVTOTOR
Production conditions
Production volume:
8 000 u/year
6
Operation mode:
working days - 350 days
shift duration (Gross) – 11,5 hours /day
operational time (Net) – 612,75 min /shift
5
Production equipment:
1. Welding semi-automatic inverter type
2. Main framing Fixture
3. Metal structure for electric hoist
4. Hoist fixture
5. Rail for electric hoist
6. Electric hoist
4
1
2
3

5.

AVTOTOR
The composition of the equipment for supply:
1. Fixture – 1 unit
2. Manual hydraulic trolley – 2 units
3. Electric hoist for unloading (250kg) – 1 unit
4. Monorail 7m – 1 unit
Fixture terms:
- mobility (on wheels)
- clamps – manually
- painting – orange
Production conditions
Fixture
Manual hydraulic
trolley
Shipment terms: CIF Kaliningrad, Russia
Electric hoist
with monorail

6.

AVTOTOR
Scope of Supplier responsibility:
- Design, manufacturing, supply, installation and
commissioning of Manual Main Framing fixture and
hoist fixture (incl. the necessary materials)
- Supply of the manual hydraulic trolleys and Electric
hoist.
Production Description
Scope of Buyer responsibility:
- Provide of 3d Model of the frame (or the sample) for
design by Supplier
- Preparation of the workplace
- Manufacture and installation the metal structures for
the hoist mounting

7.

AVTOTOR
Sunshine M2
Production Description

8.

AVTOTOR
Sunshine Tree Flow Chart
72V battery box
assembly Fixture #4
Frame welding
assembly
Fixture #1
Rear frame front support
assembly welding
(Fixture #2)
Base frame
assembly
welding
Fixture #2
Frame Parts
(from supplier)
Rear frame
assembly welding
Fixture #5
Welding of
window parts
Fixture #6
Body Side (from
supplier)
Combination
welding of top
cover
Fixture #3
Body Parts (from
supplier)

9.

AVTOTOR
Production conditions
Production volume:
8 000 u/year
Operation mode:
working days - 350 days
shift duration (Gross) – 11,5 hours /day
operational time (Net) – 612,75 min /shift
Production equipment of Main Line:
1. Welding semi-automatic inverter type
2. Main framing Fixture
3. Metal structure for electric hoist
4. Hoist fixture
5. Rail for electric hoist
6. Electric hoist
5
4
3
2
1

10.

AVTOTOR
Production Description
5
4
3
2
1

11.

AVTOTOR
The composition of the equipment for supply:
1. Fixture – 1 unit
2. Manual hydraulic trolley – 2 units
3. Electric hoist for unloading (250kg) – 1 unit
4. Monorail 7m – 1 unit
Fixture terms:
- mobility (on wheels)
- clamps – manually
- painting – orange
Production conditions
Fixture
Manual hydraulic
trolley
Shipment terms: CIF Kaliningrad, Russia
Electric hoist
with monorail

12.

AVTOTOR
Scope of Supplier responsibility:
- Design, manufacturing, supply, installation and
commissioning of Manual Main Framing fixture and
hoist fixture (incl. the necessary materials)
- Supply of the manual hydraulic trolleys and Electric
hoist.
Production Description
Scope of Buyer responsibility:
- Provide of 3d Model of the frame (or the sample) for
design by Supplier
- Preparation of the workplace
- Manufacture and installation the metal structures for
the hoist mounting
English     Русский Правила