Похожие презентации:
NUR_AKIMATESIL_1011
1.
NUR_AKIMATESILSite engineering solution
2.
CONTENTS• Site Equipment layout Solution
Power connection solution
Dry contact solution
GPS and Transmission
BBU board layout and connection
Antenna Connection
3.
Site Equipment layout SolutionDescription:
Reuse W001,Need use 25A&63A CB
Post BBU :V9920
VSWd1+VBPe3p+VPM
1* Tri-Sector Antenna
1*0.3m UBA antenna
Antenna
1*ZXMW NR8961(OBU2+ODU)
1*R9266 M728090
R9264H M901821
1*R9269E M1821
BBU
1*V9920
VSWd1
1*P6000 +2*D121
3
4.
CONTENTS• Site Equipment layout Solution
Power connection solution
Dry contact solution
GPS and Transmission
BBU board layout and connection
Antenna Connection
5.
Power connection layout SolutionD121
R9269E M1821
V9900+
1*R9266 M72809+
1*R9269E M1821
Power system:
1*P6000+
2*D121
V9920
R9266 M728090
D121
To D121
AC Input
To R9266 M728090
To ODU
To V9920
5
6.
CONTENTS• Site Equipment layout Solution
Power connection solution
Dry contact solution
GPS and Transmission
BBU board layout and connection
Antenna Connection
7.
Dry contact layoutDescription:
②
Monitor Cable layout shown below.
D121
P6000
②
D121
① RJ45-DB15
①
② DB9-DB9
V9920
7
8.
CONTENTS• Site Equipment layout Solution
Power connection solution
Dry contact solution
GPS and Transmission
BBU board layout and connection
Antenna Connection
9.
GPS and TransmissionTransmision
ETH1 is used for Fiber transmission
VSWd1 Interface
To MME/UME
GPS
This Site No GPS required
9
5G Leading Innovation
10.
CONTENTS• Site Equipment layout Solution
Power connection solution
Dry contact solution
GPS and Transmission
BBU board layout and connection
Antenna Connection
11.
BBU Board Scenario DescriptionBBU board interface
board name Port Name Proper type
VSWd1
ETH1
10/1G
VBPe3p
OF1
10G
VBPe3p
OF2
25G
RRU interface port
VSWd1
To MME/UME
RRU name
Port Name
Proper ty
R9266 M728090
OPT1
10G
R9269E M1821
OPT1
25G
To MME/UME
VBPe3P
OF1 OF2 OF3 OF4 OF5 OF6
OF7 OF8 OF9
11
5G Leading Innovation
12.
BBU Board Scenario DescriptionR9269E M1821
R9266 M728090
10G
10G
25G
25G
VBPe3P
12
5G Leading Innovation
13.
CONTENTS• Site Equipment layout Solution
Power connection solution
Dry contact solution
GPS and Transmission
BBU board layout and connection
Antenna Connection
14.
Antenna connection14
Antenna
Sector1
sector2
sector3
Azmin
50
180
290
M Tilt
0
0
0
E Tilt
0
0
0
High/m
13.5
13.5
13.5
15.
Thank YouSeptember, 2024