Похожие презентации:
Armenian nuclear power plant. Operation and supervision. Overloading mechanisms
1.
Armenian Nuclear Power PlantArmenian Nuclear Power Plant
OPERATION AND SUPERVISION Overloading
mechanisms
IAEA, ARM/9/016,
Technical
Rez,
CzechNovember,
Republic, 17-19
January 2007
IAEA RER
9134Meeting,
Vienna
27-30
2017
2.
IAEA, ARM/9/016, Technical Meeting, Rez, Czech Republic, 17-19 January 20073.
Armenian Nuclear Power PlantMap of Armenia
The ANPP is
located in the Ararat
Valley, 10 km from the
regional
center
of
Armavir, 28 km from
the capital of Yerevan,
16 km from the border
with Turkey.
IAEA, ARM/9/016,
Technical
Rez,
CzechNovember,
Republic, 17-19
January 2007
IAEA RER
9134Meeting,
Vienna
27-30
2017
3
4.
Armenian Nuclear Power PlantQuantity of Units
•Type of reactors
•Commissioning :
•Shutdown:
•The beginning of restart
Works
•Restart
ANPP general information
Unit 1
Unit 2
Unit 1
Unit 2
– 2 (two)
– WWER-440 (V-270)
– 22 December 1976
– 5 January 1980
– February 1989
– March 1989
Unit 2 – April 1993
Unit 2 – 5 November 1995
IAEA, ARM/9/016,
Technical
Rez,
CzechNovember,
Republic, 17-19
January 2007
IAEA RER
9134Meeting,
Vienna
27-30
2017
4
5.
Armenian Nuclear Power PlantDocumentation
At the Armenian NPP, the following main
documents on the part of the GPM are used:
PB 10-382-00 Rules for the Arrangement and
Safe Operation of Cranes
NP 043-11 Requirements for the installation and
safe operation of cranes
Job description of the senior master of the GPM
section of the Centralized Maintenance
Department. RP.ATD.18.CMD-035
Job description of the bridge crane operator of
the GPM section. RP.ATD.18.CMD-056
IAEA, ARM/9/016,
Technical
Meeting,
Rez, Czech27-30,
Republic,
17-19 January 2007
IAEA
Vienna
November
2017
5
6.
Armenian Nuclear Power PlantDocumentation
Instructions for the safe manufacture of work for the
slinger. UB.ATD.13.OIP-002
Operating
Instructions
for
bridge
cranes.
UE.ETD.CMD-010.
Leadership. Safe operation of cargo handling devices,
devices and containers in the CJSC ANPP.
UB.ATD.08.OIP-006
Requirements for the device and safe operation of loadlifting cranes for nuclear power facilities. NP-043-03
Rules for the installation and safe operation of cranes.
PB 10-382-00
Maintenance instructions for bridge cranes
IAEA, ARM/9/016,
Technical
Rez,
CzechNovember,
Republic, 17-19
January 2007
IAEA RER
9134Meeting,
Vienna
27-30
2017
6
7.
Armenian Nuclear Power PlantOrganization of supervision
In the Republic of Armenia, the supervisory
authorities are:
National Technical Security Center
The State Committee for Regulation of Nuclear
Security of the Republic of Armenia (GAN)
The person responsible for the supervision of the
safe operation of the MRM
IAEA, ARM/9/016,
Technical
Rez,
CzechNovember,
Republic, 17-19
January 2007
IAEA RER
9134Meeting,
Vienna
27-30
2017
7
8.
Armenian Nuclear Power PlantNumber of Bucket mechanisms
Number of cranes used at ANPP :
Total number - 108 units, of which;
Special cranes - 5 units;
Truck-mounted cranes - 4 units;
Gantry cranes - 1 piece.
Under the ban - 11 pcs.
IAEA, ARM/9/016,
Technical
Meeting,
Rez, Czech27-30,
Republic,
17-19 January 2007
IAEA
Vienna
November
2017
8
9.
Armenian Nuclear Power PlantSpecial cranes
Special ANPP cranes :
Overhead traveling crane 30/5 t.f. (Central
Hall)
Single-girder bridge crane with
lifting 3,2 t.f. (in node of fresh fuel)
Overhead crane c/l 250/30/2 t.f. (CH)
Overhead crane c/l 125/20 (MH TP) -2 pcs.
IAEA, ARM/9/016,
Technical
Meeting,
Rez, Czech27-30,
Republic,
17-19 January 2007
IAEA
Vienna
November
2017
9
10.
Armenian Nuclear Power PlantOrganization of control over work with loadlifting mechanisms
To carry out proper monitoring of the state
and works of the GPM at the Armenian NPP,
the following are appointed:
Person to oversee the safe operation of the
GPM;
The person in charge of the condition of
the GPM;
Persons responsible for the good condition
of the CST;
Persons responsible for the safe operation
of cranes;
Crane operators;
Slingers.
IAEA, ARM/9/016,
Technical
Rez,
CzechNovember,
Republic, 17-19
January 2007
IAEA RER
9134Meeting,
Vienna
27-30
2017
10
11.
Armenian Nuclear Power PlantOrganization of control
To monitor the performance of work using the
GPM :
Bypass of equipment, premises and work sites;
Scheduled inspections of units (integrated,
targeted);
Operational checks;
Audits of quality contractors.
.
IAEA, ARM/9/016,
Technical
Rez,
CzechNovember,
Republic, 17-19
January 2007
IAEA RER
9134Meeting,
Vienna
27-30
2017
11
12.
Armenian Nuclear Power PlantInspection of removable load handlers
The following were developed at the ANPP:
instruction for inspecting removable load handlers and
containers;
instruction for inspecting the sling on a textile basis;
New logs for inspection and recording of inspection
results of removable load-handling devices.
IAEA, ARM/9/016,
Technical
Meeting,
Rez, Czech27-30,
Republic,
17-19 January 2007
IAEA
Vienna
November
2017
12
13.
Armenian Nuclear Power PlantAffiliate Review
Based on the results of the WANO peer review in September
2017, two inconsistencies were found in the documentation :
There are no locations for defective lines;
on one site the inspection of the sling was carried out with
a violation of the inspection time - 20 days instead of 10 days.
IAEA, ARM/9/016,
Technical
Meeting,
Rez, Czech27-30,
Republic,
17-19 January 2007
IAEA
Vienna
November
2017
13
14.
Armenian Nuclear Power PlantModernization of cranes
As part of the extension of the life of the Unit 2 of the ANPP,
work is underway to bring special cranes in compliance with
the requirements of NP043-11 :
replacement of existing electric motors;
replacement of all reducers;
replacement of electrical equipment for cranes;
replacement of crane control system;
replacement of existing and installation of additional
brakes;
replacement of existing and installation of additional limit
switches.
IAEA, ARM/9/016,
Technical
Rez,
CzechNovember,
Republic, 17-19
January 2007
IAEA RER
9134Meeting,
Vienna
27-30
2017
14
15.
Armenian Nuclear Power PlantCorrective actions
In order to exclude the repetition of events with load-lifting
mechanisms at the ANPP, they were discussed and discussed
with crane operators, slingers and responsible persons,
events from the WANO database :
WER MOW 2016-184 – the fall of the auxiliary lifting
mechanism with the carrying capacity of 20 t of overhead
crane to the low-pressure rotor of the turbine unit at Rostov
NPP;
WER MOW 2015-189 – failure of the crane of the turbine
hall during lifting operations at the Loviisa NPP (Finland);
Falling stator generator (500t) when it is shipped from a
regular place in the engine room to a transport trolley at the
Arkansas-1 nuclear power plant.
IAEA, ARM/9/016,
Technical
Rez,
CzechNovember,
Republic, 17-19
January 2007
IAEA RER
9134Meeting,
Vienna
27-30
2017
15
16.
Armenian Nuclear Power PlantAbout the ANPP Lifetime
Related to the Armenian NPP Lifetime expiry, the activities
below are being performed at our plant
a) Investigations of lifting equipment have been performed
by a specialized organization to justify the residual
lifetime in compliance with the requirements of new
norms and regulations.
b) Following the investigations, the analysis and evaluation
of the residual lifetime have been performed
c) Preliminary conclusions, with feasibility studies for the
operating lifetime extension till modernization have been
provided.
d) Based on the results of conclusions, relevant decisions
were made
e) Projects for lifting, equipment modernization with the
implementation dates specified have been developed
IAEA, ARM/9/016,
Technical
Rez,
CzechNovember,
Republic, 17-19
January 2007
IAEA RER
9134Meeting,
Vienna
27-30
2017
16
17.
Armenian Nuclear Power PlantTHANK YOU FOR
ATTENTION!
IAEA, ARM/9/016, Technical Meeting, Rez, Czech Republic, 17-19 January 2007