Похожие презентации:
Wireline Operation with MPD
1.
Wireline Operation with MPDAhmet Semih CENGİZ, MPD Service, 06.11.2020
2.
TOPICS1
MPD Equipments & Materials to be used for Wireline Operation
2
Snubbing and Logging Adapter Installation Procedure
3
Conclusion
3.
1. MPD Equipments &Materials to be used for
Wireline Operation
4.
1. Rotating Control Device (RCD)Wireline operation with MPD / MPD Service
11/13/2024
4
5.
2. Snubbing AdapterID: 7 1/16 "
Wireline operation with MPD / MPD Service
11/13/2024
5
6.
3. Logging AdapterWireline operation with MPD / MPD Service
11/13/2024
6
7.
4. Shooting NippleWireline operation with MPD / MPD Service
11/13/2024
7
8.
2. Snubbing andLogging Adapter
Installation Procedure
9.
Snubbing and Logging Adapter Installation Procedure1. Connect the snubbing and logging adapter as
follows:
A. Drain the BTR RCD via the 2-inch line or
via the 7-1/16-inch gate valve.
B. Remove the master bushings.
C. Install a safety barrier around the rotary
table.
D. Operate the BTR RCD latches and open
the latch to remove the bearing assembly
(or protective sleeve) installed previously.
E. Pick up the logging adapter and connect it
to the snubbing adapter to form the
snubbing and logging adapter assembly
(Figure 1).
Note: For clarification, after connecting the snubbing adapter
[2] and logging adapter [1], the connected components are
referred to as the snubbing and logging adapter assembly..
F. Connect the casing connection with the
logging adapter; if the connection is
different between the casing connection
and the logging adapter, a crossover
would be required for making the
connection.
Wireline operation with MPD / MPD Service
11/13/2024
9
10.
Snubbing and Logging Adapter Installation Procedure2.
Install the snubbing and logging adapter
assembly as follows (while referring to Figure
2):
A.
Guide the snubbing and logging
adapter assembly [1 & 2] through the
rotary table and slowly land it into the
BTR RCD body assembly [3].
B.
Verify that the snubbing and logging
adapter assembly is fully seated in the
body assembly, and then close the
latch.
Close the 2-inch valve and 7-1/16-inch
valve on the BTR RCD.
Proceed to pressure test the wireline
lubricator per rig or loggers procedure.
C.
D.
Note: The pressure test value is dependent on
the casing connection connected to the logging
adapter.
Wireline operation with MPD / MPD Service
11/13/2024
10
11.
3. Conclusion12.
What we do/don’t have;We have;
ID: 6.85 "
Thread: 7 " 8 rnd LTC
ID: 7 1/16"
12 ea studs & nuts
7 inc 32ppf TN125HC casing
Thread: Wedge523
STD Drift ID: 5,969 "
Wireline operation with MPD / MPD Service
11/13/2024
12
13.
What we do/don’t have;We don’t have;
X/O for logging adapter btw 7 "casing
7" 8 rnd LTC box X 7 " Wedge523 box
9 " snubbing adapter
9 " logging adapter
Wireline operation with MPD / MPD Service
11/13/2024
13
14.
What we can/can’t run;Tool
Description
with 7 1/16" snubbing adp
with 9" snubbing adp
OD (in)
max ID:5,969"
max:9"
PNX
Pulsar
1,72
1,72
1,72
HGNS
Highly Integrated Gamma Ray neutron Sonde
3,375
3,375
3,375
VSI
Versatile Seismic Imager
3,375
3,375
3,375
SS
Sonic Scanner
3,625
3,625
3,625
EDTC-GR
Gamma Ray
3,625
3,625
3,625
HRLA
High Resolution Laterolog Array
3,625
3,625
3,625
HNGS
Hostile Environment Natural Gamma Ray Sonde
3,75
3,75
3,75
ZAIT
Rt Scanner
3,875
3,875
3,875
ADT
Array Dielectric
4,77
4,77
4,77
TLD
Three Detector Lithology Density
4,77
4,77
4,77
FMI
Formation Micro Imager
5
5
5
ECS
Elemental capture Spectroscopy Sonde
5
5
5
DOBMI
Dual OBMI
5,75
5,75
5,75
XLROCK
Large Volume Rotary Sidewall Coring
6,5
6,5
6,5
NGI
Quanta Geo
6,5
6,5
6,5
CMR
Combinable Magnetic Resonance
6,6
6,6
6,6
PPC-B
Powered Positioning Device and Caliper
4.3/5.25
4.3/5.25
4.3/5.25
MDT
Modular Formation Dynamics Tester
4.5/7.5/10.5
4.5/7.5/10.5
4.5/7.5/10.5
MDT Dual Packer
MDT Dual Packer
7/8.5
7/8.5
7/8.5
MDT Saturn Packer
MDT Saturn Packer
7/8.75
7/8.75
7/8.75
Wireline operation with MPD / MPD Service
11/13/2024
14