Похожие презентации:
Presentation INTRA-GT_major projects_ENG-1 (1)
1. Solutions for Complex Gas Systems
Manufacturing / Installation / Sales2. Team Experience
A combination of experience and enthusiasmsince 1994
WWW.INTRA.LV
Experts in the modernization of Soviet stations
Most of the employees in the team have been
here for over 15 years.
Continuous professional development
Certificates LVS EN ISO 3834-2:2006, LVS
EN 1090-2
3. Installation
Construction of heating systems forindustrial facilities, shopping centers,
offices, and residential buildings.
Production
WWW.INTRA.LV
Manufacturing of gas equipment for main
and city networks.
Sale
All the necessary equipment for
gasification in one place and without
waiting.
4. Transparent process Efficiency Accurate execution
WWW.INTRA.LVTransparent process
Efficiency
Accurate execution
Cooperation
with us
Receiving the technical specifications
Clarifying the customer's requests on all important
details
Design
Project approval
Production
Delivery to the customer
Delivery of as-built documentation
Supervision of installation
5. Most significant projects
2015-20246. The largest gas distribution in Lithuania
Customer: Lithuanian gas transmissionsystem operator Amber Grid
Task: Replacement of an outdated Soviet
station with a fully automated station
compliant with European standards
Types of units: 2 filtration units, 2 metering
units, 2 regulation units, 2 heating units, 2
gas odorization units
WWW.INTRA.LV
Gas flow rate: 25,000 nm³/h
Number of units: 10
Pressure: Pmax = 54 bar(g)
Project duration: 1.5 years
Completion:2019
7.
8. Gas treatment unit Verkhnetagilskaya GRES
Customer: Inter RAO – Electric Generation JSC(Globaltechexport LLC)
Task: Reconstruction of a powerful gas treatment
unit built in 1956
Number of units: 100 (delivered using 25 trucks)
Types of units: prefabricated metal structures,
filtration unit, metering unit, regulation unit, heating
unit
WWW.INTRA.LV
Gas flow rate: 375,000 nm³/h
Pressure: Pmax = 54 bar(g)
Project duration: 1 year
Completion: 2016
9.
10. Gas treatment unit Yakutskaya GRES
Coustumer:Yakutskenergo PJSC(Globaltechexport LLC)
Task: Reconstruction of a gas treatment unit
capable of operating efficiently at air
temperatures as low as −60 °C
Number of units: 4
WWW.INTRA.LV
Types of units: metal structures, filtration unit,
metering unit, regulation unit, heating unit
Gas flow rate: 90,000 nm³/h
Pressure: Pmax = 18 bar(g)
Project duration: 5 months
Complection: 2015
11.
12. Gas treatment units Mayakovskaya and Talakhovskaya TPPs
Customer: Kaliningrad Generation LLC(Globaltechexport LLC)
Task: Construction of two new gas treatment
units within a tight schedule
Number of units: 6
WWW.INTRA.LV
Types of units: 2 large purification units, 2
metering units, 1 regulation unit, 1 heating unit
Gas flow rate: 53,000 nm³
Pressure: Pmax = 34 bar(g)
Project duration: 7 months
Completion: 2017
13.
14. Gas regulating unit for the terminal
WWW.INTRA.LVGas regulating unit
for the terminal
Liquefied natural gas
Customer: Klaipėdos Nafta
Task: Construction of a modern gas regulating
unit in compliance with European standards
Number of units: 4
Types of units: 2 regulation units, 2 metering
units
Gas flow rate: 7,000 nm³/h
Pressure: Pmax = 8 bar(g)
Project duration: 3 months
Completion: 2017
15.
16. Filter-separator unit, Kazakhstan
WWW.INTRA.LVFilter-separator unit,
Kazakhstan
Customer: RMG-RUS
Task: Construction of 3 large-diameter filterseparator lines within a tight schedule
Number of units: 3
Types of units: 3 filtration units
Gas flow rate: 670,000 nm³/h
Pressure: Pmax = 63 bar(g)
Project duration: 3 months
Completion: 2018
17.
18. Construction of the AGRS at TPP-3 with branch gas pipelines, Kazakhstan
Customer: Intergas Central AsiaTask: Construction of a new
automatic gas distribution station
within a tight schedule
Number of units: 7
Gas flow rate: 150,000 nm³/h
Pressure: Pmax = 54 bar(g)
Project duration: 6 months
Completion: 2024
19.
20.
21.
22.
23.
24. Bypass pipeline TIP-04 between main gas pipeline
"Kazakhstan-China" and MG"Almaty-Bayserke-Talgar"
Customer: Intergas Central Asia
Task: Construction of a new
automatic gas distribution station
within a tight schedule
Number of units: 7
Gas flow rate: 1,000,000 nm³/h
Pressure: Pmax = 98 bar(g)
Project duration: 6 months
Completion: 2024
25.
26.
27.
28.
29.
WWW.INTRA.LVLatvia
Lithuania
Estonia
Riga
Iecava
Mažeikiai
Jonava
Klaipėda
Värska
Karksi
Kaliningrad
Belarus
Sovetsk
Gusev
Novopolotsk
Vitebsk
Grodno
30.
WWW.INTRA.LVRussia
Kazakhstan
Uzynagash
Akyrtobe
Almaty
Kirishi
Kazan
Yakutsk
Novorossysk
YuzhnoSakhalinsk
Vladivostok
Norilsk
Verkhny Tagil
Prem
Nizhnekamsk
Yamal
Amursk
31.
Ready to help withyour tasks and
challenges
+371 67 55 75 84
intra@intra.lv
www.intra.lv