Solutions for Complex Gas Systems
Team Experience
Installation
Transparent process Efficiency Accurate execution
Most significant projects
The largest gas distribution in Lithuania
Gas treatment unit Verkhnetagilskaya GRES
Gas treatment unit Yakutskaya GRES
Gas treatment units Mayakovskaya and Talakhovskaya TPPs
Gas regulating unit for the terminal
Filter-separator unit, Kazakhstan
Construction of the AGRS at TPP-3 with branch gas pipelines, Kazakhstan
Bypass pipeline TIP-04 between main gas pipeline
9.10M

Presentation INTRA-GT_major projects_ENG-1 (1)

1. Solutions for Complex Gas Systems

Manufacturing / Installation / Sales

2. Team Experience

A combination of experience and enthusiasm
since 1994
WWW.INTRA.LV
Experts in the modernization of Soviet stations
Most of the employees in the team have been
here for over 15 years.
Continuous professional development
Certificates LVS EN ISO 3834-2:2006, LVS
EN 1090-2

3. Installation

Construction of heating systems for
industrial facilities, shopping centers,
offices, and residential buildings.
Production
WWW.INTRA.LV
Manufacturing of gas equipment for main
and city networks.
Sale
All the necessary equipment for
gasification in one place and without
waiting.

4. Transparent process Efficiency Accurate execution

WWW.INTRA.LV
Transparent process
Efficiency
Accurate execution
Cooperation
with us
Receiving the technical specifications
Clarifying the customer's requests on all important
details
Design
Project approval
Production
Delivery to the customer
Delivery of as-built documentation
Supervision of installation

5. Most significant projects

2015-2024

6. The largest gas distribution in Lithuania

Customer: Lithuanian gas transmission
system operator Amber Grid
Task: Replacement of an outdated Soviet
station with a fully automated station
compliant with European standards
Types of units: 2 filtration units, 2 metering
units, 2 regulation units, 2 heating units, 2
gas odorization units
WWW.INTRA.LV
Gas flow rate: 25,000 nm³/h
Number of units: 10
Pressure: Pmax = 54 bar(g)
Project duration: 1.5 years
Completion:2019

7.

8. Gas treatment unit Verkhnetagilskaya GRES

Customer: Inter RAO – Electric Generation JSC
(Globaltechexport LLC)
Task: Reconstruction of a powerful gas treatment
unit built in 1956
Number of units: 100 (delivered using 25 trucks)
Types of units: prefabricated metal structures,
filtration unit, metering unit, regulation unit, heating
unit
WWW.INTRA.LV
Gas flow rate: 375,000 nm³/h
Pressure: Pmax = 54 bar(g)
Project duration: 1 year
Completion: 2016

9.

10. Gas treatment unit Yakutskaya GRES

Coustumer:Yakutskenergo PJSC
(Globaltechexport LLC)
Task: Reconstruction of a gas treatment unit
capable of operating efficiently at air
temperatures as low as −60 °C
Number of units: 4
WWW.INTRA.LV
Types of units: metal structures, filtration unit,
metering unit, regulation unit, heating unit
Gas flow rate: 90,000 nm³/h
Pressure: Pmax = 18 bar(g)
Project duration: 5 months
Complection: 2015

11.

12. Gas treatment units Mayakovskaya and Talakhovskaya TPPs

Customer: Kaliningrad Generation LLC
(Globaltechexport LLC)
Task: Construction of two new gas treatment
units within a tight schedule
Number of units: 6
WWW.INTRA.LV
Types of units: 2 large purification units, 2
metering units, 1 regulation unit, 1 heating unit
Gas flow rate: 53,000 nm³
Pressure: Pmax = 34 bar(g)
Project duration: 7 months
Completion: 2017

13.

14. Gas regulating unit for the terminal

WWW.INTRA.LV
Gas regulating unit
for the terminal
Liquefied natural gas
Customer: Klaipėdos Nafta
Task: Construction of a modern gas regulating
unit in compliance with European standards
Number of units: 4
Types of units: 2 regulation units, 2 metering
units
Gas flow rate: 7,000 nm³/h
Pressure: Pmax = 8 bar(g)
Project duration: 3 months
Completion: 2017

15.

16. Filter-separator unit, Kazakhstan

WWW.INTRA.LV
Filter-separator unit,
Kazakhstan
Customer: RMG-RUS
Task: Construction of 3 large-diameter filterseparator lines within a tight schedule
Number of units: 3
Types of units: 3 filtration units
Gas flow rate: 670,000 nm³/h
Pressure: Pmax = 63 bar(g)
Project duration: 3 months
Completion: 2018

17.

18. Construction of the AGRS at TPP-3 with branch gas pipelines, Kazakhstan

Customer: Intergas Central Asia
Task: Construction of a new
automatic gas distribution station
within a tight schedule
Number of units: 7
Gas flow rate: 150,000 nm³/h
Pressure: Pmax = 54 bar(g)
Project duration: 6 months
Completion: 2024

19.

20.

21.

22.

23.

24. Bypass pipeline TIP-04 between main gas pipeline

"Kazakhstan-China" and MG
"Almaty-Bayserke-Talgar"
Customer: Intergas Central Asia
Task: Construction of a new
automatic gas distribution station
within a tight schedule
Number of units: 7
Gas flow rate: 1,000,000 nm³/h
Pressure: Pmax = 98 bar(g)
Project duration: 6 months
Completion: 2024

25.

26.

27.

28.

29.

WWW.INTRA.LV
Latvia
Lithuania
Estonia
Riga
Iecava
Mažeikiai
Jonava
Klaipėda
Värska
Karksi
Kaliningrad
Belarus
Sovetsk
Gusev
Novopolotsk
Vitebsk
Grodno

30.

WWW.INTRA.LV
Russia
Kazakhstan
Uzynagash
Akyrtobe
Almaty
Kirishi
Kazan
Yakutsk
Novorossysk
YuzhnoSakhalinsk
Vladivostok
Norilsk
Verkhny Tagil
Prem
Nizhnekamsk
Yamal
Amursk

31.

Ready to help with
your tasks and
challenges
+371 67 55 75 84
intra@intra.lv
www.intra.lv
English     Русский Правила