1.
EU Pro series installation training2.
Catalogue1. Unpacking
2. Connection and Installation
3. Software Installation
4. Software Setup
5. Post-installation verification
3.
UnpackingComposition
Autoloader
EU-5300Pro/EU-5600Pro
is consist of 1 autoloader
and 1 host machine
Firstly, check the tilt-indicator
labels, If the label is red, it
indicates that the transportation
of the package is tilted for over
80°
Host machine
4.
Unpacking-host machineRemove the packing belt
Remove the upper cover
Note: The binding straps and upper cover have
sharp edges and can be moved with caution.
Unpacking
host machine
Remove the upper foam
Installation accessories are visible.
5.
Unpacking-host machineTake out the
accessory bubble and
put it properly.
Remove the outer
package
After all packages are removed, move the instrument to the operation
panel and remove the internal fixing parts.
Remove wrapping film
6.
Unpacking-host machineRemove the fixing parts
of Test strip selection
assembly
Remove the fixing tape
Remove the 3 Phillips head screws
and remove the foam under its base
7.
Unpacking-host machineRemove the fixing parts of
the Sampling Mechanism
Sampling Mechanism
fixing part
Totally 2 red fixing cable
ties
1、Open the front cover.
Take out the 1 fixing cable
tie and form in the
horizontal direction.
2、Pull out the whole
Sampling Mechanism , and
take out the fixing cable and
form of the vertical direction.
8.
Unpacking-host machineRemoved Microscope
fixings
2、
Remove
the fixing
screws of
chamber
Remove
the fixing
plate of
the stage
3、
Remove
the
buffer
foam
1、Open the strip selection
unit to the right
9.
Unpacking-host machineRemoved Microscope
New version fixings
2、
Remove
the fixing
screws of
chamber
Remove
the fixing
plate of
the stage
3、
Remove
the
buffer
foam
1、Open the strip selection
unit to the right
10.
Unpacking-host machineAfter removing the fixings on the microscope assembly, to check the objective lens position and
manually rotate the objective lens to keep it downward vertically, confirm the 20X objective lens
snaps into the slot, as shown in the figure below,
11.
Unpacking-host machineRemove the red fixing
cable ties of the waste
pump
1、Remove 2
screws to
open the left
panel
2、Remove the
red cable ties
on the waste
pump
12.
Unpacking-autoloaderMainly including:
1. Number of tube racks: 5
2. Fix the two beams.
3. Number of screws: 6
13.
Unpacking-autoloaderRemove the
cable tie
Totally 3
Remove the
upper foam and
take out the
autoloader.
Remove the
strap
1、Remove the
cable tie on the
unloading position.
2、Remove the
cable tie on the
horizontal unit.
3、Remove the
cable tie of the
loading unit.
14.
Catalogue1. Unpacking
2. Connection and Installation
3. Software Installation
4. Software Setup
5. Post-installation verification
15.
Connection and Installation1、Place the 2 fixing beams of the autoloader to
the bottom of the main unit. As shown in the left
figure
2、Use M4* 8 screws to fix the beam onto the
main unit.
As shown below
16.
Connection and InstallationTake out the waste carton,
and take out the
connecting cables from the
inner side for convenient
connection. There is 1
connector in total.
17.
Connection and InstallationConnection cable
between autoloader and
main unit
Put the cable into
the analyzer after
connection
18.
Connection and Installation1、Make sure that the locating
pins of the autoloader are
inserted into the corresponding
pin holes of the analyzer
2、Attention Paid to the Left
and Right Gap between the
Autoloader and Main Unit.
Push the autoloader forward horizontally
to contact the main unit.
3、Lock the bottom of the
autoloader and the beam with
two M4×8 stainless steel
Phillips pan head SEMS screws.
19.
Connection and InstallationInstall the waste strip box.
20.
Connection and InstallationRequirement of PC
CPU
INTEL(
R)
CORE(TM)
I3-12 or
above, for
example i312100, Not
use i312100F (The
CPU model
with F
cannot be
used)
RAM
USB
PORT
COM PORT
PCIE
port
The width
of computer
case
MM
16 GB
DDR4 or
above
US
B3.0
ports>=
1
Expansio
n slot:
1channel
serial port
card 1 serial
ports in total
, every port
FIFO
buffer≥128by
te
1 or
above
OS
>=121
Support
win10 64 bit
Mechanic
al hard
DISK (as
Local
Disk D)
Solid
state disk
(as Local
Disk C)
1T
or above
Rea
d-write
mode:
Vertical
write
CMR
Writ
e speed:
≥100MB
/s
256G
or above
Gigabit
wired
network
card
Video
output port
Suppor
t HDMI
1
or
above
Displayer
23.5inch
esResolution:
1920*1080
or above.
The
recommende
d display
material is
IPS.
Notice: The computer needs to have at least two partitions: Local Disk C and Local Disk D.
21.
Connection and InstallationPC
Use the video cable
provided with the
analyzer to connect the
video interface behind
the main unit to the
computer.
Use the serial cable
provided with the
instrument to connect
the serial port behind
the main unit to the
computer.
USB port: 3.0
Serial port : use serial port
card ,it’s better to not use the
motherboard serial port.
USB Fixing Bracket
22.
Connection and Installation1、Remove the plug from the
reagent connector.
2、Connect reagent and waste
tubes to the connectors at the
back of the instrument
EU-50
Diluilent
Waste
23.
Catalogue1. Unpacking
2. Connection and Installation
3. Software Installation
4. Software Setup
5. Post-installation verification
24.
Software Installation – LabXpert ServerDecompress the software, doubleclick Server, click Setup, and choose
language.
25.
Software Installation - LabXpert ServerClick Next by default. Do not change the path.
26.
Software Installation – Camera DriverClick Next by default.
Click finish to end this installation.
27.
Software Installation - Main softwareClick Next by default. Do not change the path.
28.
Software Installation - Main softwareClick finish to end this installation.
29.
Software Installation – Serial Port Card DriverClick Next by default..
30.
Software Installation – Serial Port Card DriverClick finish to end this installation .
31.
Catalogue1. Unpacking
2. Connection and Installation
3. Software Installation
4. Software Setup
5. Post-installation verification
32.
Software SetupDouble-click the software
icon on the desktop, and use
the engineer account
password to log in.
service
Se s700
33.
Software Setup1、Click “Auto Detect" , the software will add the new device automatically according to
device configuration.
34.
Software Setup2.Click “Yes” to save the
settings.
Note: Restart the software after finishing the setup.
35.
Software SetupConfirm the microscope ID
option has been selected
36.
Software SetupConfirm the dry chemistry
strip type is set up exactly
37.
Software SetupSetup the Built-in Barcode
according to customer
requirement
38.
Software SetupUpgrade the instrument control
software
(Notice: If the program version is latest,
skip this step)
Notice: The power of machine and computer can’t be turned off
during the upgrading.
39.
Software SetupRecharging Reagents and first
priming
40.
Software SetupPrime the whole unit at least
2 times.
41.
Software SetupAdd User
System Setup-Users
click“Add User”
Enter the password, it need
contain numbers and letters
According to the actual
situation. The default user is
the Operator.
You are recommended to set
it as administrator.
Permission of Operator is too
low.
42.
Software SetupPrint setup
System Setup-Normal setup-Print setup
We can choose the print template and which parameters in the
template.
43.
Software SetupLIS setup
System setup-Normal setupComm. Setup
The analyzer supports
connecting LIS with network
cable.
Also support file sharing (TXT
text files).
There is a Professional
documents are connected to
LIS.
44.
Software SetupPara. Setup
System setup-Para. Setup
Parameter Items of Formed
element and Chemistry
Unit of results
Threshold setting of
qualitative parameters of
Formed element
Result range(Reference
group)
45.
Software SetupAuxiliary Setup
Including: RBC phase setup, RBC subtype ,Grid
scale, Reagent alarm conditions and so on.
46.
Software SetupReexam setup
Click New, we can add a new reexam rule.
47.
Software SetupFirst sample setup
System setupAnalyzer setup-Get
sample information
The default value
starts from No.1 and
can be modified.
Sample ID Overlap
Rule
Analyzer setupAutoloading setup
Each sample is added
up by default.
48.
Software SetupAnalysis Para
Most of the tested
parameters will directly
affect the results, and
modification is not
allowed if necessary.
49.
Software SetupStrip type
11 strips are
selected by
default, and 14
strips are used by
some hospitals.
After changing
the strip type,
reset the
parameters of the
sampling unit.
Dry chemical reflectance adjustment
Clinical guidance or professional clinical knowledge is required for adjusting values.
50.
Software SetupMaintenance setup
Maintenance is performed
automatically or a dialog
box pops up to remind the
user of the analyzer.
51.
Catalogue1. Unpacking
2. Connection and Installation
3. Software Installation
4. Software Setup
5. Post-installation verification
52.
1-Preparing to test chemistry QC1.
If the EU-5300Pro or EU-5600Pro analyzer was produced before March 2024 replacing the
threshold files according to the guidance , as shown in the below:
2. If the customer use the Quantimetrix control, we also need to replace the relevant file .
53.
2-Color calibrationOperation
1. Prepare a bucket of new test
strips, place 3 strips into pick
unit and place a tube filled
with distilled water in the STAT
tube holder and push it to
STAT position, click
to test.
2.
After calibrating ,if the result
shows “successful”, click
“save” to finish.
54.
3-Threshold CalibrationOperation
1. Prepare a bucket of new test strips, and put
12 pure water into the urine test tube. The
water volume shall be the same as possible.
Carry out dry chemical test. Discard the first
and second result and calculate the mean
value (pure water LEU reflectance) using the
results of the last 10 samples.
55.
4-Installation Qualification ProcedureTo verify the installation qualification by the guidance
56.
Device TestingAfter finishing all setups, we can fasten all screws under
autoloaders and make sure devices are steady. Then we
need test some samples to check device works well or not.
1) Prepare at least 10 samples. Then put them on rack and
load rack on the autoloader.
2) Choose test mode then click start button to let system
test the 10 samples.
3) While testing, we need to observe below point:
a. The strip can be select out fluently.
b. Sample can dropping on every block on strip without
touching strip
c. Rack can be transfer to unloading area fluently after
finishing test.
d. After finishing all test, user can see every results
(sediment and chemistry result) in report and review
screen.